Vietnam is one of the fastest-growing countries in the world, with the industrial sector being the most robust. Recognizing this trend and aiming to be a pioneering group in providing fire protection equipment and materials, Hanoi Fire Protection and Electrical Engineering Joint Stock Company has been and continues to serve all customers in need nationwide and globally.

 

With the support of customers and partners over the years, we have continuously operated and grown to become one of the leading companies in importing fire protection equipment. We are proud to provide the most reputable services to our customers.

With the motto "Bringing high trust to customers, providing high-quality products," Hanoi Fire Protection and Electrical Engineering Joint Stock Company always strives for long-term and extensive cooperation with all customers.

 

 

FIRE PROTECTION SYSTEM DESIGN

With many years of experience in consulting and designing fire protection systems, KCG specializes in the field of fire protection system design and fire-resistant materials.

FIRE PROTECTION SYSTEM INSTALLATION

With many years of experience in installing fire protection systems, KCG specializes in the field of fire protection system installation and fire-resistant materials for projects.

CONTROL PANEL DESIGN AND INSTALLATION

The electrical system is like the human nervous system. It requires a control center to ensure smooth operations.

WATER AND ENVIRONMENT ELECTRICAL SYSTEM DESIGN AND INSTALLATION

To achieve high efficiency in electrical and water system construction, both in terms of safety and aesthetics, it is essential to have a technical design drawing.

Fire protection system installation

 

FIRE PROTECTION SYSTEM INSTALLATION

The Fire Protection System Installation Company was established as a company specializing in the design, consulting, and installation of fire protection systems (fire prevention and fighting systems).

Through 6 years of formation and development, we are committed to continuing to provide the best Fire Protection System Installation services to accompany you long-term.

With a team of experienced Fire Protection System Installation engineers and workers who have participated in various fields of design, consulting, and construction in the categories of electromechanical, fire protection, and security for high-rise buildings and industrial zones.

We commit to always providing standard-compliant equipment and complete documentation that has been approved by the authorities. Our post-installation Fire Protection System Installation services are always quick and accurate.

Construction Standards and Documents Applied:

Design Documents

  • TCVN 3890 – 2009: Fire protection equipment for buildings and structures - Equipment, layout, inspection, maintenance

  • TCVN 7336 – 2003: Fire protection systems - Installation requirements

  • TCVN 5738 – 2001: Automatic fire alarm systems - Technical requirements

  • TCVN 2622 – 1995: Fire protection for buildings and structures - Design requirements

  • TCVN 6484: Lightning protection for buildings and structures - Design requirements

  • TCVN 5873:1995: Steel welding joints

  • TCVN 7472:2005: Welding. Fusion welded joints in steel

  • TCVN 5639:1991: Acceptance of installed equipment - Basic principles

Vietnam Construction Standards related to Fire Protection Systems

Electromechanical contractor for Fire Protection System Installation, specializing in consulting, design approval, and construction of fire protection systems for high-rise buildings and production factories.

With a team of experienced engineers in the field of fire protection system installation, having implemented many large fire protection projects for buildings and production factories, we are confident to satisfy your company with our service quality.

Fire Protection Systems

  • Addressable and zonal fire alarm systems

  • Water supply hydrants for fire trucks

  • Wall hydrant systems

  • Sprinkler fire extinguishing systems

  • Fire extinguishing systems for electrical rooms, server rooms

To ensure the quality management process issued by the state for construction as well as material volume and work completion according to the construction progress by the contractor submitted to the Investor and Project Management Board, the following work processes must be followed:

I. Preparation Phase:

  1. The contractor coordinates with related parties to monitor the construction progress of related parties to carry out related work, meeting the overall progress of the project.

  2. Prepare construction deployment drawings for each job, submit them to the Investor and Project Management Board for approval.

Materials and Supplies:

  1. All materials must be submitted before being brought into the project and must be in accordance with the tender or winning bid documents and the approved design documents.

  2. If there are material changes, they must be submitted to the Investor and Design Consultant for approval before being brought into the project.

  3. When bringing materials into the project for construction, approval slips will be made.

  4. Simultaneously, provide origin and certification documents of the approved materials and supplies.

  5. For imported materials and equipment, they must meet the technical requirements of the design, have a certificate of origin (CO), and a quality certificate (CQ) copy.

II. Construction Phase at the Project:

  1. Based on the approved construction deployment drawings, proceed with the actual construction at the project.

  2. The Contractor uses approved materials and equipment for construction.

A. Fire Water Supply System:

  1. Fabricate V-shaped steel to hang STK pipes, use U-clamps to fix the pipes.

  2. Install STK pipes using electric welding and threading according to standards.

    • TCVN 5873:1995: Steel welding joints

    • TCVN 7472:2005: Welding. Fusion welded joints in steel

    • Use rust-resistant welding rods 3.2 mm

  3. Install the vertical pipe into the position for cabinet mounting.

  4. Install fire extinguishing cabinets, fire hydrants, nozzles, and fire pumps.

B. Lightning Protection System:

  1. Install grounding electrodes, dig 30 cm wide, 40 cm deep trenches according to the approved design, and spread cables using U-bolts to connect the cables to the rods.

  2. After installation, check the ground resistance of the grounding electrode. If it is less than 10 ohms, the rod can be installed. If it is greater than 10 ohms, chemicals must be used or additional rods must be installed.

  3. The cable from the roof will be routed through PVC D20 protective pipes fixed with U-shaped hooks and connected to the grounding system through a ground resistance test box.

C. Fire Alarm System:

  1. Route cables to all installation locations of detectors, manual call points, sirens, and the fire alarm control panel.

  2. Measure insulation resistance and continuity of the installed wiring system.

  3. Install equipment (smoke detectors, manual call points, sirens, fire alarm control panel, etc.).

  4. Inspect the entire system and conduct a trial run of the equipment.

Inspect the entire system and make adjustments as necessary.

Fire Protection System Installation Company

Identify and repair leaking, broken water supply and drainage pipes inside walls, outside, underground, and all other related water loss issues.

Install sanitary equipment such as showerheads, siphons, sinks, toilets, urinals, and other related equipment.

Repair electrical issues such as circuit breaker tripping, fuses, sockets, switches, and other related electrical equipment.

Install all wall-mounted electrical equipment such as light bulbs, electric fans, clothing hooks, etc.

Hanoi Fire Protection and Electrical Engineering Joint Stock Company

Address: No. 20, Alley 30, Lane 71 Hoang Van Thai, Khương Trung Ward, Thanh Xuan District, Hanoi

Hotline: 0968 252 229 – 0968.981.114

Email: pccchanoibk.@gmail.com

Website:http://phongchaychuachayhanoi.com